Planning a primary-suite addition, finishing a basement bedroom, or building an ADU in the backyard? Great for property value—but it changes the math on your septic system. In Ada and Canyon counties, bedroom count is the big driver of septic design flow. Add sleeping capacity and you may need a larger tank, more drainfield, or treatment upgrades to stay compliant and avoid overloading the field.

installing new septic

If you’re even thinking about adding a bedroom or ADU, start with a Septic Inspection. We’ll check the current system, map the site, and tell you exactly what your project requires.


The 60-Second Answer (So You Don’t Guess)
  • Bedrooms = design flow. More bedrooms typically mean more daily wastewater, which can require a tank and/or drainfield upgrade.

  • Attached vs. detached adds nuance. A detached ADU acts like a separate dwelling; many plans require its own tank/field or engineered solution.

  • Permits look for capacity, location, and setbacks. You’ll need a site plan that shows your existing system and where the new lines/field can go.

  • Fix easy issues early. Cracked lids, missing risers, or a clogged effluent filter won’t pass an inspection for your building permit.

  • Best path: inspection → design options → permits → install/upgrade through our Septic System Install team.


Why Bedrooms Matter (And How Inspectors Think)

Health districts and plan reviewers need confidence your system can handle peak daily flow. Bedrooms are used as a simple proxy for occupancy. When you add sleeping space, they’ll ask:

  1. What’s the current system rated for? (Tank size, drainfield type/area, treatment level)

  2. How many bedrooms post-remodel? (Main home + any ADU)

  3. Is there reserve area on the lot? (Room for new or expanded field)

  4. Any risk factors? (Shallow soils, high water table, slope, irrigation, setbacks)

If your current design capacity is already tight, the addition triggers an upgrade. That’s not bad news—doing it now protects your field and property value.


ADU Scenarios We See All the Time


1) Attached ADU / Finished Basement Suite

Often uses the existing tank and field. You’ll need to prove capacity and show where a future reserve could go. If capacity is short, we can design:

  • Larger tank (or add a second tank in series)

  • Field expansion or new zone with a distribution box

  • Advanced treatment to reduce loading when soil area is limited


2) Detached Backyard Cottage

Frequently treated as a separate dwelling. Options include:

  • Independent tank + field for the ADU

  • Shared tank with separate treatment/flow controls

  • Engineered treatment (pressure distribution or advanced units) when space is tight


3) Garage Apartment Over a Shop

Watch setbacks and traffic areas. We design routes that avoid vehicle loads and maintain separation from wells, property lines, and surface water. Risers and insulated lids make future maintenance simple.


Not sure what applies to your parcel? Book a Septic Inspection and we’ll map what you have, then give you a plain-English plan.


What We Check During a Pre-Project Septic Inspection
  • Locate & map tank, lids/risers, cleanouts, distribution box, and drainfield

  • Measure sludge/scum to see if pumping is due and to document condition

  • Inspect tees/baffles and clean/verify the effluent filter

  • Walk the field for wet spots, compaction, or irrigation overspray

  • Assess reserve area and site constraints (trees, driveways, slopes)

  • Provide a simple drawing + capacity summary you can attach to your permit packet

If pumping is due, we’ll handle it during the same visit: Septic Pumping.


Design Paths That Keep Projects Moving

Depending on soil, space, and bedroom count, we’ll propose one or more:

  • Tank upsizing or add-on tank to meet design flow

  • Field expansion (trenches, bed, or pressure doses) with a distribution upgrade

  • Advanced treatment unit when space/soils are constrained

  • Effluent filter retrofit to protect any existing field during and after the project

  • Risers & insulated lids to make future inspections and pumping quick year-round

  • Line relocations to satisfy setbacks and keep vehicles off the field

If your current system shows wear (cracked lids, settled lines, pump issues), we’ll correct those under Septic System Repair before you submit plans—clean reports keep reviewers happy.


Space & Setback Reality Check (Before You Draft Plans)
  • Reserve area: You’ll be asked where a future replacement field could go. Don’t let the ADU sit on your only good soil.

  • Access: Keep a clear path for trucks to reach the tank—no walls, tight gates, or permanent landscaping blocking service.

  • Irrigation: Re-aim sprinkler heads away from the field; overspray can cause saturation and denial.

  • Traffic loads: No driveways, RV pads, or parking over tanks or trenches—compaction shortens field life.

  • Trees & roots: Plan building and landscaping to avoid drainfield invasion.

We’ll mark and map all of this during inspection so your designer knows exactly where not to build.


Pro Tips to Reduce Your Required Capacity
  • Ditch the disposal or use it sparingly. Grease and food solids drive faster pumping intervals and field stress.

  • Install ultra-efficient fixtures (true WaterSense toilets, low-flow showers that still feel good, smart dishwashers). Flow reduction helps—surges still matter, so space laundry and showers.

  • Add an effluent filter if you don’t have one; it’s low-cost insurance for the field.

  • Fix leaks (flappers, fill valves, drips). Small, constant flows can overwhelm fields over time.

  • Educate guests/tenants: Toilet paper only; no wipes, feminine products, or “flushable” anything.

These upgrades don’t replace design capacity, but they protect your investment and may keep you inside the limits you already have.


Typical Project Timeline (So You Hit Your Build Dates)
  1. Week 0: Book Septic Inspection for mapping and capacity check.

  2. Week 1–2: We draft the septic design aligned with your building plans.

  3. Week 2–4: Submit for permits; we answer any reviewer questions.

  4. Week 4–6+: Septic System Install (tank/field/upgrades) scheduled alongside your general contractor’s timeline.

  5. Final: Documentation and as-builts for your records and future resale value.

Need it faster? Tell us your escrow or construction dates—we’ll prioritize the critical path items.


Red Flags That Can Stall Permits (We Fix These Fast)
  • No risers; buried lids (we add risers and safe lids)

  • Unclear tank size or field type (we verify and document)

  • Evidence of surfacing/wet areas (diagnose and repair before submittal)

  • Irrigation overspray on the field (re-aim and document corrections)

  • Vehicle traffic/compaction over lines (reroute, protect, or replace segments)

All of the above are routine Septic System Repair items for our crew.


Ready to Add That Bedroom or ADU?

Bring us in early. One site visit can save weeks of back-and-forth later. We’ll tell you exactly what your septic can handle today and design the cleanest path to approval.


 
 
 